6.1 Zrównoważony rozwój miejskich obszarów funkcjonalnych - nr naboru FEPK.06.01-IZ.00-031/26
FE dla Podkarpacia · National call
Summary
Not an R&D call a Polish company can use, by Scindu's rule.
Funds public space renewal and safety in the Dębica–Ropczyce functional area, with the Municipality of Dębica as the sole eligible applicant.
- Who can apply
- Companies cannot apply: municipality.
- Amount
- PLN 20,543,483Catalogue budget
- Deadline
- 28 Oct 2026in 4 days
- Status
- Openopened 10 Sept 2026
Machine-classified from the call text; check eligibility at the source.
Description
The description is on the provider's page.
Who can apply, in detail
- Applicant types
- Municipality
- Purpose
- Energy, environment, infrastructure
- R&D relevance
- 0 of 3
- Poland eligible
- Yes
- Country limit
- Poland, Dębica–Ropczyce functional area; applicant limited to the Municipality of Dębica
- Region
- podkarpackie
- Consortium
- Unclear
- Readiness level (TRL)
- —
- Topics
- Public space renewal
- Urban safety
- Urban regeneration
Machine-classified from the call text; check eligibility at the source. 23 Oct 2026
Conditions
Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.
- Applicant type
- The only applicant named in this noncompetitive intake is Gmina Miasta Dębica.
- Application restriction
- Applications are accepted from 10 September 2026 through 28 October 2026, 23:59, via WOD2021; the received date is when the application is submitted in WOD2021.
- Application restriction
- The application must describe the applicant’s management approach for preparation, procurement, technical oversight, financial settlement, acceptance and future infrastructure management; the selection criterion checks experience and whether a project-management description was submitted. These are planning and capacity criteria, not source-mandated project job titles, staffing counts or qualification thresholds.
- Eligible project scope
- This call is limited to project “Atrakcyjne przestrzenie publiczne Dębicko–Ropczyckiego Obszaru Funkcjonalnego”, type IV physical renewal and safety of public spaces. The stated activity scope includes public-space renewal supporting resident integration or recreation/activity, new green areas, monitoring, and lighting only as part of a wider project.
- Other condition
- The central portal record and current call rules identify the same noncompetitive FEPK.06.01 project call as FEPK.06.01-IZ.00-031/26; the envelope identifier remains the exact current local catalogue value.
- Other condition
- The maximum advance-payment share is 90% of the awarded co-financing amount; this is an advance-payment limit, not a higher grant-intensity rate.
- Other condition
- The regulation says a minimum and maximum total project value are “not applicable,” and maximum eligible expenditure is also “not applicable.” These are not numeric grant caps; the source separately states the PLN 1,000,000 minimum eligible-expenditure floor and the 85% funding maxima.
- Other condition
- The project must submit its final payment request by the end of 2028 Q3. The regulation estimates contract signing by 30 August 2027; this is an estimate, not a minimum/maximum project-duration rule.
Amounts and costs
- Catalogue budget
- PLN 20,543,483
Figure as listed by the provider. Whether it is the total allocation or a per-project cap is unverified unless a reviewed condition says so.
- Call allocation
- PLN 20,543,483
Allocation stated for this noncompetitive call. This is the call allocation and is not restated as a separate numeric maximum grant per project; the regulation notes that the contractable amount can depend on the monthly EUR exchange-rate/allocation algorithm and that the allocation may be changed.
- Eligible cost
- The current EFRR guidelines’ indirect-cost catalogue includes a project coordinator and other staff engaged in project management, settlement, project monitoring or administration, management staff, support/administrative/legal staff and accounting; this call’s own RWP fixes indirect costs at 0.5% of eligible direct costs, so these are cost components of that common flat-rate pool rather than separately reimbursed salaries.
- Eligible cost
- Direct costs qualify only when they meet the 2021–2027 expenditure-eligibility guidelines and the current SZOP; call-specific and catalogue exclusions still apply.
- Eligible cost limit
- 0.5 eligible_direct_costs
Fixed 0.5% flat-rate pool applied to all eligible direct costs. This is an overhead settlement rule, not a staff salary or service-rate benchmark. Direct costs subject to public aid/de minimis have specific aid-treatment conditions in RWP §8.5.4; applicant-specific aid treatment is not resolved here.
- Funding intensity, maximum
- 85
Maximum EFRR share and maximum total public co-financing are each 85% of eligible expenditure under the stated SZOP limits. Footnotes say the funding agreement may contain a departure; no project-specific exception is assumed.
- Ineligible cost
- The catalogue lists direct costs for the beneficiary’s or its employees’ own-performance remuneration and project-management services (beneficiary obligations to the institution, procurement, routine project operation, settlement and outcome monitoring) as ineligible. These direct-cost exclusions are distinct from the separately limited flat-rate indirect personnel pool.
- Ineligible cost
- For type IV public-space monitoring activities, costs of remuneration for persons/services monitoring public space and equipment directly unrelated to the monitoring system are expressly ineligible. This does not state that all project monitoring, all project personnel, or all other project activity wages are prohibited.
- Own contribution, minimum
- 15
Minimum own contribution stated for the beneficiary; funding agreement may contain departures from the §7.1–7.2 maximum percentages, as indicated in their footnotes.
- Project cost, minimum
- PLN 1,000,000
Minimum eligible expenditure for the project is PLN 1,000,000. This is an eligible-cost floor, not a grant minimum or total-project-value floor.
Personnel and services
Project management
Staff cost the grant can fund
Cost treatment is only through the fixed 0.5% flat-rate indirect-cost pool of eligible direct expenditure, subject to the application-specific aid classification and grant agreement. This category does not establish separate salary reimbursement, salary rate, named roles, required hiring, headcount, FTE, duration or qualifications. Distinguish project-level monitoring/admin functions in the indirect-cost list from personnel/services monitoring public space, whose remuneration is expressly excluded for Type IV.
Source documents
Call facts
- Opens
- 10 Sept 2026
- Provider
- FE dla Podkarpacia
- Source
- funduszeunijne.gov.pl
- Checked
- 23 Oct 2026
- Review status
- Partial review
- Reviewed
- 23 Oct 2026
This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.