4.2 Zintegrowane terytorialnie inwestycje w edukację
FE dla Podlaskiego · National call
Summary
Not an R&D call a Polish company can use, by Scindu's rule.
Funds preschool places and infrastructure adaptations for six named municipalities, requiring benefits across multiple municipalities and alignment with the territorial strategy.
- Who can apply
- Companies cannot apply: municipality.
- Amount
- PLN 29,343,169Catalogue budget
- Deadline
- 31 Dec 2026in 68 days
- Status
- Openopened 22 Jan 2026
Machine-classified from the call text; check eligibility at the source.
Description
The description is on the provider's page.
Who can apply, in detail
- Applicant types
- Municipality
- Purpose
- Deployment and investment
- R&D relevance
- 0 of 3
- Poland eligible
- Yes
- Country limit
- Poland; Juchnowiec Kościelny, Turośń Kościelna, Choroszcz, Supraśl, Wasilków and Zabłudów municipalities
- Region
- podlaskie
- Consortium
- Optional
- Readiness level (TRL)
- —
- Topics
- Preschool infrastructure
- New preschool places
- Education quality
- Territorial investment
Machine-classified from the call text; check eligibility at the source. 23 Oct 2026
Conditions
Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.
- Applicant restriction
- Only the six named BOF municipalities may apply: Juchnowiec Kościelny, Turośń Kościelna, Choroszcz, Supraśl, Wasilków, Zabłudów.
- Application restriction
- Applicants must have complete final technical documentation at application, including in design-and-build delivery, and define the project scope exhaustively.
- Eligible project scope
- Investments must create new preschool places and adapt existing places for preschool-aged children to improve education quality; new infrastructure is allowed only in exceptional and justified cases. Projects must support inclusive access in generally accessible facilities; segregating infrastructure is excluded.
- Other condition
- Application budget must detail spending categories, calculations and alignment with project scope; cost estimates and market evidence support reasonableness. These are budget substantiation requirements, not staffing/pay rules.
- Other condition
- Open noncompetitive call 4.2, “Infrastructure of preschool education in BOF”; current deadline 31 December 2026 at 23:59, subject to early closure if applications exceed the call allocation.
- Other condition
- No minimum or maximum total project value is set in the current regulation.
- Other condition
- General cost eligibility period is 1 January 2021 through 31 December 2029; each project’s actual eligibility period is fixed in its funding agreement.
- Partner requirement
- Each investment must be identified in the approved ZIT territorial strategy, affect more than one BOF municipality, and satisfy either the statutory partnership-project route or declare a shared effect/result/end product such as shared use of the infrastructure.
Amounts and costs
- Catalogue budget
- PLN 29,343,169
Figure as listed by the provider. Whether it is the total allocation or a per-project cap is unverified unless a reviewed condition says so.
- Call allocation
- PLN 29,343,169
Call-wide allocation pool, not a per-project ceiling. Regulation permits increase/decrease based on EUR exchange-rate and contracting-limit algorithm; current availability may be lower after awards.
- Eligible cost
- Eligible direct scope includes expansion/reconstruction/renovation/adaptation of preschool facilities and necessary equipment; playground construction/modernization only as a needs-justified, inclusion-linked project element; construction supervision only where required by law.
- Eligible cost
- Indirect costs are mandatory and reimbursed through flat rates against eligible direct costs: 5% for eligible project costs up to PLN 2m; 4% from PLN 2m through PLN 10m; 3% from PLN 10m through PLN 15m; 2% above PLN 15m.
Indirect flat-rate pool is mandatory. Exact PLN 2m and PLN 10m boundaries appear in both adjacent tier descriptions; retain as unresolved and do not select a tier for exact-boundary cases.
- Eligible cost limit
- 5
Maximum cross-financing share of eligible direct costs.
- Eligible cost limit
- 10
Maximum eligible playground cost as a share of eligible direct costs; only needs-based and tied to inclusion/EFS+ objectives.
- Eligible cost limit
- 10
Renewable energy installation costs: maximum 10% of eligible costs; distinct from playground limit.
- Funding intensity, maximum
- 85
Maximum grant funding as share of eligible project costs, subject to applicable public-aid rules.
- Ineligible cost
- General EFRR operational costs in the investment operating phase, including employee remuneration, are excluded; this does not itself prohibit hiring from other sources or establish treatment of staff costs during the project period.
- Own contribution, minimum
- 15
Minimum own contribution share of eligible costs; public-aid rules may affect the applicable support intensity.
Source documents
Call facts
- Opens
- 22 Jan 2026
- Provider
- FE dla Podlaskiego
- Source
- funduszeunijne.gov.pl
- Checked
- 23 Oct 2026
- Review status
- Partial review
- Reviewed
- 23 Oct 2026
This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.