Open topic on driving innovation uptake of disaster risk solutions
Horizon Europe · Grant topic
Summary
A Polish company can use this call for R&D.
Funds demonstration, validation and integration of advanced disaster risk solutions, requiring first responders or disaster risk authorities from three countries.
- Who can apply
- Companies can lead: SME, large company, startup, research org, university, NGO, public body.
- Amount
- €3M per projectTotal budget €6,000,000
- Deadline
- 05 Nov 2026 01:00 CETin 12 days
- Status
- Openopened 6 May 2026
Machine-classified from the call text; check eligibility at the source.
Description
Expected Outcome:
Project results are expected to contribute to some or all of the following expected outcomes:
• Accelerated adoption of high-TRL (Technology Readiness Level) disaster risk solutions across diverse sectors;
• Facilitated integration of innovative technologies into existing disaster prevention, preparedness, response, and recovery frameworks;
• Promoted collaboration among stakeholders to scale proven solutions and enhance resilience;
• Addressed barriers to deployment, ensuring accessibility and usability of advanced DRS technologies;
• Strengthened evidence-based decision-making through demonstration and validation of high-TRL solutions in real-world scenarios;
• Promoted visibility of civil security research results.
Scope:
This topic aims to foster the widespread adoption and integration of high-TRL (Technology Readiness Level) disaster risk solutions (DRS) across multiple sectors, enhancing societal resilience to various hazards, including climate. The focus is on overcoming barriers to deployment, ensuring accessibility, and strengthening collaboration among stakeholders to drive innovation uptake. Projects should promote the adoption of high-TRL solutions by public and private sector organizations involved in disaster risk management, developing strategies for scaling and commercializing innovative DRS technologies to ensure they reach end-users efficiently. They should also demonstrate how these technologies can complement or replace existing disaster preparedness, response, and recovery frameworks by developing integrated governance and coordination models across sectors and levels for disaster preparedness, response, and recovery in multi-hazard and cascading risk scenario interoperability standards, and guidelines for integrating new solutions into national and European civil protection systems. The project should especially liaise and support other disaster resilience projects in driving their uptake as well as examine how to build synergy pathways with other preparedness grants, such as Knowledge for Action in Prevention & Preparedness (KAPP) funding call of the Union Civil Protection Mechanism (UCPM).
Addressing deployment barriers is crucial, including identifying and mitigating technical, regulatory, financial, and social obstacles hindering the uptake of advanced solutions, while ensuring accessibility and usability for diverse stakeholders such as first responders, local authorities, and communities and individuals in a vulnerable situation. Projects should also demonstrate the real-world effectiveness of high-TRL solutions through large-scale pilot projects and demonstrations, generating robust evidence to support data-driven decision-making and optimize disaster risk reduction strategies. Initiatives should consider the capacity gaps of the UCPM[1], align with EU disaster resilience objectives and build on existing programs, ensuring synergies with relevant policies, funding mechanisms, and technological ecosystems. The private-public cooperation chapter of the Preparedness Union Strategy should especially be a guiding document. Proposals are encouraged to incorporate digital tools, AI-driven analytics, digital twins such as Destination Earth, IoT applications, and other emerging technologies to enhance disaster preparedness and response.
Proposals should have a strategy to promote the visibility of the project and the results to the broader public in order to show the potential of European civil security research (political sphere, private sector, citizens). This could entail the European Civil Protection Forum and the European Commission Disaster Risk Management Knowledge Centre platform as examples.
In this topic the integration of the gender dimension (sex and gender analysis) in research and innovation content should be addressed only if relevant in relation to the objectives of the research effort.
Technology Readiness Level - Technology readiness level expected from completed projects
Activities are expected to achieve TRL 8 by the end of the project – see General Annex B.
[1] eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:52025DC0286
Who can apply, in detail
- Applicant types
- SME, Large company, Startup, Research org, University, NGO, Public body
- Purpose
- Research and innovation
- R&D relevance
- 3 of 3
- Poland eligible
- Yes
- Country limit
- Mandatory first responders or disaster risk authorities from at least three EU Member States or Associated Countries.
- Region
- Any
- Consortium
- Required
- Readiness level (TRL)
- 8
- Topics
- Disaster risk solutions
- Technology uptake
- Operational validation
- Disaster resilience
Machine-classified from the call text; check eligibility at the source. 23 Oct 2026
Conditions
Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.
- Applicant type
- The topic refers applicants to General Annex B. Unless a specific topic condition provides otherwise, a consortium must include three independent legal-entity beneficiaries established in different countries: at least one in an EU Member State and two others in different EU Member States or Associated Countries. Affiliated entities do not count toward that minimum. This is the general default; topic-specific exceptions and full applicant eligibility remain to be checked.
- Eligible project scope
- Type of Action: Innovation Actions.
- Other condition
- The General Annexes state that for lump-sum and unit grants, the funding rate is already applied in the methodology used to fix the amounts and is not shown in the grant agreement. The action-type maximum rate below is therefore a general Horizon Europe ceiling, not an additional calculation to apply to this topic’s fixed lump-sum amount.
- Other condition
- Subject to restrictions for the protection of European communication networks.
- Partner requirement
- This topic requires the active involvement, as beneficiaries, of at least 3 first responders or authorities in charge of disaster risk from at least 3 different EU Member States or Associated Countries.
- Technology readiness level at end, maximum
- 8 TRL
Expected technology readiness level by project end; this describes project outcomes, not applicant eligibility or a hiring condition.
- Technology readiness level at end, minimum
- 8 TRL
Expected technology readiness level by project end; this describes project outcomes, not applicant eligibility or a hiring condition.
Amounts and costs
- Indicative budget
- €6,000,000
Topic budget as stated in the portal's budget table. Lump-sum and per-project limits are in the call conditions.
- Eligible cost
- The topic specifically adopts a Horizon Europe lump-sum grant. The applicable Lump Sum MGA treats the grant as a contribution for completion of work packages; eligibility depends on the amounts in Annex 2 and proper completion/implementation (or results achieved) during the action period. This is not reimbursement of each beneficiary’s actual payroll or service invoices, and does not establish a salary entitlement.
- Eligible cost
- For project-based Horizon Europe lump sums, the 2026 Commission guidance requires realistic estimates per cost category, beneficiary/affiliated entity and work package. Personnel-cost estimates are permitted only for cost items that would qualify under the corresponding actual-cost eligibility rules, and must follow normal practice, be reasonable, and be necessary and in line with proposed activities. These are inputs for the fixed lump-sum estimate; actual payroll is not separately reimbursed or reported as a claim under the lump-sum grant.
- Eligible cost
- For the applicable lump-sum model, the contribution is set out in the grant agreement Annex 2 and broken down by participant and work package; payment eligibility is tied to work-package completion and proper implementation or achieved results during the action period, as stated in the agreement. Actual underlying payroll or subcontract cost is not reimbursed invoice-by-invoice under this form.
- Funding intensity, maximum
- 100 percent of eligible costs per beneficiary
General Annex allows a rate of up to 100% for non-profit legal entities in Innovation Actions. The rate is fixed in the grant agreement and for this topic’s lump-sum form is already applied in the amount methodology; this does not add a second payment rate.
- Funding intensity, maximum
- 70 percent of eligible costs per beneficiary
General Annex maximum for Innovation Actions is 70% for beneficiaries other than non-profit legal entities. The rate is fixed in the grant agreement and for this topic’s lump-sum form is already applied in the amount methodology; this does not add a second payment rate.
- Expected project funding, up to
- €3,000,000
Indicative expected EU contribution per project stated as around EUR 3 million; this is an estimate, not a minimum, maximum, or binding per-project cap. Applicants may request a different amount.
- Expected project funding, from
- €3,000,000
Indicative expected EU contribution per project stated as around EUR 3 million; this is an estimate, not a minimum, maximum, or binding per-project cap. Applicants may request a different amount.
- Topic allocation
- €6,000,000
Indicative total topic allocation stated as an amount in EUR million in the call overview; it is distinct from the expected EU contribution per project. Allocation scope: per topic.
Personnel and services
Other role
Staff cost the grant can fund
Natural persons working under a direct contract other than an employment contract may be included as personnel cost estimates only when assigned to the action, working under conditions similar to an employee, and the result belongs to the beneficiary (unless otherwise agreed). The estimate follows actual-cost eligibility; no role or pay rate is specified.
Other role
Staff cost the grant can fund
Costs for employees under an employment contract or equivalent appointing act and assigned to the action; any estimated amount is only a budget input subject to the call’s lump-sum methodology and applicable actual-cost eligibility rules. This is not a prescribed job, required hire, headcount or salary rate.
Other role
Staff cost the grant can fund
Seconded-person personnel cost estimates are conditional on assignment to the action, employee-like working conditions and ownership of the work result by the beneficiary (unless otherwise agreed), and must correspond to actual costs and not differ significantly from comparable employee tasks. This cost category does not prescribe a job or salary.
Other role
Staff cost the grant can fund
The work of an SME owner or natural person beneficiary who receives no salary may be declared as personnel costs only if general eligibility conditions are met and the amount is calculated as a unit cost under Annex 2a. No hourly/monthly amount is asserted here.
Source documents
- Horizon Europe Work Programme 2026-2027, Civil Security for Society, Part 6
- Horizon Europe General Annexes 2026-2027
- EU Grants: Horizon Europe MGA — Multi & Mono, V1.2, 01.06.2026
- EU Grants: How to manage your lump sum grants, V1.5, 01.06.2026
- EU Grants: Programme Lump Sum MGA — Multi & Mono, V1.0, 01.11.2024
Call facts
- Opens
- 6 May 2026
- Deadline model
- Single-stage
- Programme
- Horizon Europe · 2021 - 2027
- Call
- HORIZON-CL3-2026-01 · Civil Security for Society 2026
- Types of action
- HORIZON Innovation Actions
- Keywords
- Open topic
- civil security
- disaster risk solutions
- high-TRL
- innovation uptake
- innovative technologies
- preparedness
- resilience
- Source
- ec.europa.eu
- Checked
- 23 Oct 2026
- Portal updated
- 23 Oct 2026
- Review status
- Partial review
- Reviewed
- 23 Oct 2026
This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.